CABRILLO BRIDGE SEISMIC RETROFIT
- Client: City of San Diego/Caltrans
- GC: Disney Construction
- Location: San Diego, CA
Success Story – G&F provided expansion joint and abutment joint demolition, deck surface removal, concrete-encased duct bank removal, pier access opening expansion, and the dowel drilling of over 18,000 holes – by hand – inside the pier super structure columns of this 100-year-old historic San Diego bridge. Our team worked various shifts, meeting the challenge of maintaining public access on an extremely tight schedule.